Working within the Highways Sector

What

As a Painting Contractor who has achieved NHSS 19A for the corrosion protection of Ferrous Materials such as steel highways bridges by industrial paint coatings we are able to perform highway maintenance services including:

  • Abrasive Blasting
  • Steel Repairs, and
  • Protective Coatings

The NHSS 19A standard is mandatory for Painting Contractors working for the Highways Agency Suppliers and demonstrates the commitment we have to our clients and workforce in the areas of regulation, environment, quality and safety beyond their existing accreditations.

Our site team is fully ICATS trained (Industrial Coating Applicator Training Scheme) working constantly with our In-House ICATS trainer.  Our operatives are also trained in working at heights and street works.

Recent contracts have been undertaken for Amey and Henry Boot on several highways bridge projects for Sheffield Highways where we have had to work within possession times, often at night.

What

Why

Our company’s robust procedures and safe systems of work are externally audited and accredited to a number of standards and demonstrate our commitment to continuous improvement.  We project manage works in high risk environments, such as rail, roads and over rivers and waterways.

We meet the standards required by Network Rail, the Highways Agency and utility companies by achieving:

  • Quality Management System registered to ISO 9001
  • National Highways Standard Sector Scheme 19A, NHSS19A, which works in line with our ISO 9001 accreditation
Why

more info


red railing

 

blue railing

HIGHWAYS PARAPET PROJECT


AMEY Streets Ahead Birmingham PFI
- 46 structures city wide

Wash down parapet steelwork with water and detergent and stiff bristle brush. Rinse off and allow to dry. Preparation for coatings by mechanical cleaning followed by Highways Coatings System listed below overall:-

 

  • Primer - DTp Item 115
  • Intermediate Coat - DTp Item 116
  • Finish Coat – DTp Item 168
All works were undertaken within a Traffic Management Area and our vehicles complied with Chapter 8

 

 

 


bridge1.jpg

 

under a river bridge which has been coated

HIGHWAYS BRIDGE PROJECT

 

Abergavenny Railway Viaduct, Usk

M24 Network Rail Paint System was adhered to for this project.

Environmental aspects were considered upon this project because the bridge was over the River Usk. This river is a highly regarded fishing river with such species as trout, salmon and perch.

 

 

 

more info

We are approved contractors for major coating manufacturers for the preparation and coating of the DTp Systems approved by the Highways Agency.

Bridge maintenance painting creates many varied problems and so commands a category of its own.  The biggest obstacle to overcome in this field is that of maintenance.  Road, railways and navigational rivers all have to be kept open to traffic/and the public.

Our Health and Safety Record is excellent which is reflected in the assiduous pre-planning of our works and the quality of performance of our experienced contract managers and fully trained operatives whilst strictly adhering to laid down safety procedures.

We are aware of the environmental aspects within our works and can encapsulate the working area, when required, to protect the local environment and the public.


Structures throughout th UK for the Highways Agency

Preparation of complete structure by means of grit blasting to SA2/5 standard to remove surface contaminants before applying the application of coatings to meet DTp Systems for the Highways Agency.

 

new painted bridge over water

bridge2.png

 


Footbridges

Footbridges can be coated with NON-SLIP decking and HI-VIZ kerbing.

 

bridge3.png

 


Underside of Road Bridge

Due to the bridge location being in a C5 Environment, Wardle Painters were able to offer our client a high preformance, two component, high solid, low VOC epoxy paint system.  The system’s low temperature cure and rapid overcoating properties allowed Wardle Painters to complete the 3 coat  system (320 microns DFT) within the allocated programme.
 
underbridgebefore.pngunderbdirgeafter.png
 
 

Case Studies